Business Issue:-
The client’s objective is to manufacture prefab roof and wall panels at their production facility in Riyadh, KSA. The project's promoters have acquired the license to produce the walls and roof panels, based on the KOTO system, a globally recognized technology for prefab buildings.
It now needs to prepare a detailed feasibility study report comprising a preliminary analysis, market study, operational & economic feasibility, financial study, etc.
The feasibility report has to be as per the SIDF regulatory formats. As the end purpose is also to raise funds for the proposed factory, the awarding consultant must be able to deliver on this parameter. All the required elements highlighted by SIDF must be fulfilled.